DDBC
试题分析:文章介绍了悉尼歌剧院的历史和建设情况。
1.D 细节题。根据The Opera House with a sailing roof was designed by a famous Danish architect (丹麦建筑大师),Utzon.说明设计师来自丹麦,故D正确。
2.D 细节题。根据In 1962, the designs were finalized (定稿) and the construction began. In 1967, they started the decoration inside. It took 14 years in total to build the Opera House.说明悉尼歌剧院是从1962开始建到1967年建成,故D正确。
3.B 细节题。根据第二段1,2行The Sydney Opera House cost around $100 million and was paid for by the public 6,225 square meters of glass was used to build it.说明悉尼歌剧院的建设费用是用公众出的牢固B正确。
4.C 主旨大意题。文章介绍了悉尼歌剧院的历史和建设情况。故C正确。
考点:考查了社会历史类阅读
点评:本文介绍了悉尼歌剧院的历史和建设情况,题目设置方面对细节题的考查较多。